Excellent
20,921 reviews
Excellent
20,921 reviews
Couldn't load pickup availability

Installation Manual for the J.P Instruments EDM-760 Twin has 19 pages Cover date: July 20, 1999 Table of Contents: 1. INSTALLING THE INDICATOR 2. EXHAUST GAS TEMPERATURE PROBE 3. TURBINE INLET TEMPERATURE PROBE 4. USING ORIGINAL TIT PROBE 5. CYLINDER HEAD TEMPERATURE PROBE 6. SPARK PLUG GASKET CHT PROBE 7. INDUCTION AIR/CARBURETOR TEMPERATURE 8. OIL TEMPERATURE PROBE 9. OUTSIDE AIR TEMPERATURE PROBE 10. FUEL FLOW OPTION 11. DATA PORT 12. WIRING 13. EGT AND CHT PROBE WIRING MARKINGS 14. ROUTING THE WIRING HARNESS 15. INDICATOR INSTALLATION & RECORD 16. DESCRIPTION OF INSTRUMENT 17. INSTRUMENT OPERATION 18. OPERATION 19. SPECIFICATIONS AND LIMITATIONS 20. COMPONENT PARTS LIST FOR EGT/ TIT PROBE 21. COMPONENT PARTS LIST FOR CHT PROBE 22. COMPONENT PARTS LIST FOR OIL PROBE 23. COMPONENT PARTS LIST FOR OAT PROBE 24. COMPONENT PARTS LIST FOR IAT PROBE 25. COMPONENT PARTS LIST FOR TWIN ENGINE EGT/CHT 26. WEIGHT AND BALANCE DATA 27. CHANGING PROGRAMMED LIMITS 28. TROUBLE-SHOOTING FIG-1 INSTRUMENT BEZEL TEMPLATE (DWG. 760124) FIG-2 EGT/CHT/TIT PROBE PLACEMENT FIG-3 EGT PROBE INSTALLATION 12 FIG-4 OIL PROBE INSTALLATION FOR LYCOMING FIG-5 OIL PROBE INSTALLATION FOR CONTINENTAL FIG-6 DRAWING 5057 WIRE PREPARATION FIG-7 WIRING LIST TWIN EDM-760, DRAWING 760701 FIG-8 WIRING THERMOCOUPLE DIAGRAM DRAWING 760202 Fig-9 WIRING FUEL FLOW DIAGRAM 760744 INSTRUCTIONS FOR CONTINUED AIRWORTHINESS (ICA) APPENDIX – A, FUEL FLOW TRANSDUCER INSTALLATION.